''
  • -55%
  • New
GMW17943
search
  • GMW17943

GMW17943

$43.00
$19.35 Save 55%

GMW GMW17943 [ Active ] Fuel/Charge Port Door Test of Freeze Performance and Test of Contaminant Intrusion Protection to Charge Inlet/Capless Fuel Pipe – Component Level

standard by General Motors Worldwide , 10/01/2024

Quantity

Full Description

ENGLISH CURRENT VERSION * CONTAINS COLOR

Purpose.

To determine the intrusion protection performance to charge inlet/capless fuel pipe and to determine how the fuel door or charge port door operates when subjected to wet conditions at freezing temperatures at several defined fixture inclinations that simulate various parking angles or shipping attitudes.

• Reference 4.3.1 for Water Intrusion Protection Test of Fuel/Charge Port Door for Intrusion to Charge Inlet/Capless Fuel Filler.

• Reference 4.3.2 for Dust Intrusion Protection Test of Fuel/Charge Port Door for Intrusion to Charge Inlet/Capless Fuel Filler.

• Reference 4.3.3 for Freeze Performance Test with Door Closed for Fuel Filler and Charge Port Door.

• Reference 4.3.4 for Freeze Performance Test with Door Open for Charge Port Door Only.

R00002334
chat Comments (0)
No customer reviews for the moment.